Project 1

Polon 3000 fire alarm panel fully installed — complete with Zeus backup batteries, power supply, and the EKS monitoring module tucked inside. Everything wired up clean and tested ready.

Always satisfying to see these safety systems come together properly. Fire protection done right!

imperative to be an expert at doing everything when you can.

Project 2

KADe controllers (KDH-KS204-IP series) installed – each one handles 4 doors/apartments. Clean wiring, 12V power supply connected, and everything tested. LEDs are lighting up green, so looks good so far.

These small boxes do a big job for security. Happy with how neat it came out this time!

Project 3

Brick wall channeling done, switch/socket boxes fixed, and flexible conduits neatly routed for low & high voltage circuits. Ready for plastering – ensuring clean, safe, and future-proof electrical infrastructure from the core.

Project 4

Configured Schrack relay board for hotel heating: one relay per apartment/room, DIN-rail mounted with terminal strips, circuit breakers, and neat multi-core cabling. Full wiring, labeling, and testing for precise temperature control and system reliability.

Project 5

Prepared and verified the main network rack for a 5-star hotel, featuring TP-Link Omada SDN managed switches (24-port models with PoE+ and SFP+ uplinks) for high-speed internet backbone and IPTV/multicast distribution. Organized cable management with Cat6/Cat6a patching, power checks, LED status verification, and full system testing to ensure zero downtime, reliable connectivity across rooms, and seamless guest Wi-Fi/TV experience.

Project 6

Zero-to-complete electrical installation for ANIMAX shop (Timișoara, RO): LED lighting grid, power systems, and all wiring. Solo project management with focus on reliability, aesthetics, and compliance.

Project 7

Completed a neat main distribution board using Schneider, NOARK, and other reliable breakers.
Proper wiring, clear labeling, and a strong focus on safety and code compliance.